2/2
Home /

IMG 20140116 174429 868

IMG_20140116_174429_868.jpg IMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777ThumbnailsIMG 20140116 174400 777Thumbnails

The 3rd wall (the one with the front door) framed. All I need to do is to finish screwing and nailing it together and then erect it, after which I can start on the final wall.