The gable-end overhangs are now installed on all 4 sides. The ridge board already extended 1 foot over the end of the house, but it was necessary to install special boards on all 4 sides to give the overhang rafter a place to join.
The gable-end overhangs are now installed on all 4 sides. The ridge board already extended 1 foot over the end of the house, but it was necessary to install special boards on all 4 sides to give the overhang rafter a place to join.